Platinum 1st Access - Register now with Ken Yeung 416-618-9890 
Ken Yeung 7780 Woodbine Ave. Unit 15 Markham, ON L3R 2N7
Mobile: 416-618-9890 Fax: 905-604-6795 Email Ken


Appleview Homes is a new townhouse development by Ace Development Ltd currently in preconstruction at Concession Road 3, Clarington. Sales for available units start from mid$500's. Appleview Homes has a total of 83 units. Sizes range from 1563 to 2263 square feet.

 

Appleview Townhomes Details

Project Name

Appleview Bowmanville Townhomes            

Main Intersection

Concession Rd 3 & Regional 57 Rd

Address

Concession Rd 3, Clarington, ON

Builder 

Ace Development Ltd

Size Range

1563 - 2263 sq.ft

Number of Units

83 

Estimated Occupancy

Summer 2020

Starting Price

Mid $500,000

 

 

From Appleview Homes: 


This is Appleview, in Bowmanville. The kind of place where we all wish we’d grown up. In smaller towns, when the houses are a little farther apart it seems that people grow a little closer together. And that’s what you’ll find here. A place with a true small town character, where local shop owners know you by name, and the Power Centre stores give you all the choice in the world. It’s a place where the apple orchard is next door, and two golf courses are just up the street. A place where kids can walk to school, play hopscotch on the sidewalk, or have a rip-roarin’ game of road hockey until someone calls “car”. And then start right back up again. A place where you’ll wake up in the morning knowing that you made the right decision. And the wind will blow the scent of apple trees through your window at night.

 

At Appleview, whichever heritage design you choose, you’ll be living in a neighbourhood with true   small-town  character and charm. Walk down the street past welcoming front porches, columns, coach house-style garage doors and the historic look of stone, brick, traditional siding and cedar-style shakes. There are fine details like oval windows, dormers and gables. Inside are gourmet kitchens, spa-style ensuites and stylish up-to-the-minute finishes. If you’re looking for more in your life then the homes of Appleview in Bowmanville are what you’ve been looking for.

 

Appleview Towns Highlights

- Brick & Stone Elevation

9' ceiling on 2nd floor

- Garage to House door entry (where grade permits)

- Modern Casement Windows

- Conduit for Future Electric Car & Solar Panel

- Walking distance to schools, shopping and amenities

- Easy connection to GO transit

-Toronto is just 1 hour away on Hwys 2 & 401

 

 The vendor will enrol the house in the Tarion New Home Warranty Program and the purchaser agrees to pay Tarion enrollment fee. 

Where the purchaser is given a choice of materials or colours, the purchaser agrees to confirm such choices to the vendor within 7 days of being requested to do so, otherwise failing which the vendor will make such choices on behalf of the purchaser agrees to accept the same. 

 

The vendor reserves the right to substitute materials of equal or better quality and purchaser agrees to accept the same. 
 

The purchaser acknowledges that it is at the vendor’s discretion door swings may be different than those indicated on brochures, and agrees to accept swings as adjusted at the vendor’s discretion.

 

Incentives

- $2,500 in Decor Dollars

Stainless Steel Appliance Package

Laminated Floor*

- Capped Development Charges

- 4th Washroom on Main Floor

Finished Area of the Main Floor

Modern Garage Door

Deposit Structure

-$10,000 on Signing

-$10,000 in 30 Days

-$10,000 in 90 Days

-$10,000 in 120 Days

-$10,000 in 150 Days

-$10,000 in 180 Days

-$7,500 in 270 Days

-$7,500 in 360 Days

Developer

Ace Development Ltd is a construction company that assists clients from the very outset to the completion of their project. Ace Development Ltd serves the 5 basic functions of:

 

1. Defining and establishing the scope of the construction project.

2. Pre-construction project planning including preparation and scheduling of the projects, phasing plans, budgeting/cost-modelling, subcontractor qualification etc.

3. On-site execution of the project includes scheduling, quality control, safety management, subcontractor management, and status reporting and change management.

4. Monitoring and controlling the project

5. Closing of the project related to the post-construction activities.


Register below for 1st in-line platinum all access or call KEN YEUNG 416-618-9890 for more information!



Registry Form


 

Appleview Towns - Floor Plan

Appleview Towns - Incentives

Appleview Towns - Worksheet

Appleview Towns - Brochure

First Name: 
Last Name: 
Email: 
Phone: 
Comments: 
 
* * Maximum of 2000 characters